2 full walls painted lilac (side walls), leaving the ‘door’ wall and ‘window’ wall left to do. We had to repair some wallpaper on those walls so we didn’t do them today, and we want to paint the woodwork around the door frame (which we forgot when doing the other side of the room) so we’ll do that first.
Nearly done, feels weird to be decorating.
I think we’re basically decided to try and make it to Maelstrom as well, if we can get our booking in before the deadline.
Car MOT due in June, from the same pay packet we’ll need to use to go to Malestrom – but screw it – it’s only money (car will be at *least* £400 I think).